TECDIVINGDK · KNOWLEDGE CENTRE

CCR BAILOUT
PLANNING

Bailout is not “spare gas.” It is an independent life-support plan capable of taking the diver from the point of failure through ascent and decompression.

CORE PRINCIPLE

PLAN FROM THE WORST REASONABLE FAILURE POINT.

IMMEDIATE ACCESS

A catastrophic loop problem may require an immediate transition to open circuit. The first bailout gas must be breathable at the failure depth and directly accessible.

FULL ASCENT

The plan must account for travel from the failure point to each subsequent gas, including ascent time, gas switches and all required decompression.

REALISTIC RMV

Emergency open-circuit consumption can be significantly higher than calm CCR breathing. Bailout planning should use a deliberate stressed RMV assumption rather than normal loop consumption.

REDUNDANCY

Individual bailout and team bailout strategies have different dependencies. Shared gas can extend capability, but it increases the obligation to remain together and maintain compatible plans.

THE BASIC GAS EQUATION

VOLUME = RMV × AMBIENT PRESSURE × TIME.

GAS USED (L) = RMV (L/MIN) × PRESSURE (BAR) × TIME (MIN)

Example only: at 60 m, ambient pressure is approximately 7 bar. A stressed RMV of 30 L/min for 2 minutes would require 30 × 7 × 2 = 420 L before any ascent segment is added.

That 420 L is not a complete bailout requirement. A real plan must integrate changing pressure during ascent, decompression time, gas-switch points and contingency reserve.

WORKED EXAMPLE · DEEP SEGMENT

CALCULATE THE PATH TO THE NEXT BREATHABLE GAS.

This deliberately simplified example demonstrates the method — it is not a decompression schedule. Assume bailout at 60 m, stressed RMV 30 L/min, 2 minutes to stabilize, ascent to 30 m in 3 minutes, 2 minutes at 30 m, then 1 minute to 21 m where a suitable next bailout/decompression gas is available.

60 m · 2 MIN

30 × 7.0 × 2 = 420 L

60 → 30 m · 3 MIN

Using 5.5 bar average pressure: 30 × 5.5 × 3 = 495 L

30 m · 2 MIN

30 × 4.0 × 2 = 240 L

30 → 21 m · 1 MIN

Using 3.55 bar average pressure: 30 × 3.55 × 1 = 106.5 L

DEEP-SEGMENT SUBTOTAL = 1,261.5 L

Adding a hypothetical 50% contingency would make this 1,892.25 L before the 21 m-to-surface decompression requirement is added. The remaining ascent must be calculated separately from the actual decompression schedule and gases. The example shows why “one bailout cylinder” is not itself a gas plan.

SEGMENT THE ASCENT

BAILOUT IS A CHAIN OF BREATHABLE GASES.

1 · DEEP BAILOUT

Must be breathable at maximum operating depth and sufficient to stabilize, solve immediate problems and reach the next planned gas.

2 · INTERMEDIATE GAS

If used, it must become breathable before the deep bailout is exhausted and must remain suitable through its planned operating range.

3 · DECOMPRESSION GAS

High-oxygen gas can reduce decompression time but introduces its own MOD and gas-switch hazards. The bailout plan must remain valid if a planned gas is unavailable.

INDIVIDUAL VS TEAM BAILOUT

THE MATHEMATICS AND THE TEAM CONTRACT MUST MATCH.

INDIVIDUAL

Each diver carries enough gas to complete the bailout independently according to the chosen planning assumptions. This reduces dependence on teammate proximity but increases carried gas.

TEAM

Gas can be distributed across a disciplined team, but the plan becomes dependent on team integrity, compatible gases, positioning and the ability to donate under stress.

LOST TEAM MEMBER

A team-bailout strategy must explicitly address separation. “The team has enough gas” is incomplete unless the plan defines what each diver can do if access to shared gas is lost.

MORE THAN VOLUME

Regulator performance, cylinder identification, hose access, gas density and task loading all matter after bailout. A mathematically sufficient cylinder can still be operationally poor.

INSTRUCTOR INSIGHT · KIM HENRIKSEN · TECDIVINGDK

BAILOUT STARTS AT FAILURE — NOT AT THE FIRST DECO STOP.

The question is not how much gas is needed at 21 m. The question is how much breathable gas is needed from the deepest credible failure point until the diver can safely surface.

KEY TAKEAWAYS

WHAT TO REMEMBER.

01 · DEPTH FIRST

The first bailout gas must work at the actual failure depth.

02 · USE STRESSED RMV

Do not plan emergency OC consumption from calm CCR breathing.

03 · PLAN EVERY SEGMENT

Include stabilization, ascent, switches and decompression.

04 · DEFINE TEAM DEPENDENCY

Shared bailout requires an explicit separation and donation strategy.

CONTINUE LEARNING

RELATED KNOWLEDGE.

GAS PLANNING & MINIMUM GAS

Review the pressure, time and RMV calculations behind emergency gas planning.

GAS SWITCHING & VERIFICATION

Bailout is only useful when each gas can be positively identified and safely selected.

REFERENCES & FURTHER READING

OPERATIONAL BASIS FOR CCR BAILOUT.

CCR SAFETY GUIDANCE

Divers Alert Network

Decompression, Stage, and Bailout Cylinders.
Explains the role of bailout cylinders in catastrophic CCR loop failure and the need for suitable gas throughout the exit.
CCR RISK CONTEXT

Divers Alert Network

Rebreather Myths.
Emphasizes that CCR redundancy requires separate bailout gas and that decompression dives require appropriate contingency gas planning.
TEAM BAILOUT EXPERIENCE

Divers Alert Network

Diving Out of Bounds.
Illustrates the increased team dependence created by communal bailout strategies on deep technical dives.
IMPORTANT DISTINCTION

This page explains planning principles. Actual bailout volumes depend on the complete dive profile, equipment, gases, RMV assumptions, decompression model and training-agency procedures.

This website uses cookies. By continuing to use this site, you accept our use of cookies.  Learn more